I was getting tired of my old looking oak...
I decided it was time for a change. An update.
I saw a cool thing on Pinterest that you could paint over old oak and make it look stunning.
So I started with the mantle.
I bought a quart of General Finishes Java Gel Stain and did the mantle.
Easy peasy.
Soooo happy with the end results.
See?
Stunning!
So since I'm so smart and talented and home do-it-yourself-er I started the cabinets for a kitchen make over!
1/8 Started sanding down my first door....My little helper was never far behind:)
While the first two dried, I started on the trim. I painted trim and lots of it...
Everything required 3 coats and a day or so to dry in between. Then the top coat was another three coats. Back and front times all of this....
I also did underneath the bar...
First can of stain...empty!
1/15/14
Soooo beautiful!
Three coats of top coat and a few days to dry...
Ready to hang...
1/20
Or was it??This is where I hit a snag because I felt like it went on very shiny on the top coat and I didn't like it.
I did lots and lots of research and asked questions and went back in to the Four Sisters Furniture store in Ogden to ask an "expert".
Cursed Pinterest for making everything look so dang easy! This was turning in to quite a project!
After only six days "in use" I had managed to have a piece of paint tape snag and pull the top layer off ...
And people's fingernails were scratching up the doors! UG!
I called General Finishes and asked their recommendation and it seemed the only way to fix the doors was to start over,
Waa! Waa!
Then life happened quite a bit in the beginning of February...(See next posts for basement flood)
By February 14th
I got my sandpaper back out and sanded that top coat off of these two doors.
Luckily I didn't have other cabinets that were to the top coat stage yet.
It was work.
It was gross but I did the front sides only so it was do-able.
I bailed on the water based top coat and went for the gel top coat and I was much happier!
Stripped off and ready for a fresh coat...
Much better!
I set up little painting stations all around the house...in my craft room, in the basement...
I used these fun little yellow triangles to keep them from sticking to anything while they dried.
The basement was sometimes cold so it took longer for things to dry but we dealt with it.
2/27 I had the upper cabinets all done!
Wahoo!
Then Mitch and Amy decided to come for their Spring Break in March.
I suddenly had a deadline!
The contrast continued to wow me and fueled my motivation to finish!
I started on the bottom half...
We were in a mess...
But somehow no one drank the Draino and just moments before the plane landed...
We changed out the hardware on the handles for a sleek modern look....
More life happened in March (see next posts of Liz's fateful fall and arm catastrophe) and it was March 25th before I staged the kitchen for a photo shoot of the final product!
It's gorgeous!
A year later I still love it!
I will admit tho that the floor trim still isn't finished...
How do I do it with smushed goldfish on the floor and constant traffic going through?
I'm sure one of these nights I will just pull an all nighter and try to do it.
Til then....Look UP!
No comments:
Post a Comment